Friday, 19 April 2019

Minimum Wage & Variable D.A for Stone Mines Employees w.e.f. 01.04.2019 - Ministry of Labour & Employment

Minimum Wage & Variable D.A for Stone Mines Employees w.e.f. 01.04.2019 - Ministry of Labour & Employment

File No .1/8/(4)2018 LS-II
Government of India
Ministry of Labour& Employment
Office of the Chief Labour Commissioner (C)
New Delhi
Dated:27/3/ 2019
O R D E R

In exercise of the powers conferred by the Central Government Vide Notification No.S.0 .189(E) dated 19th January , 2017 of the Ministry of Labour & Employment, the undersigned hereby revise the rates of Variable Dearness Allowance on the basis average consumer price index number for the preceding period of six month ending on 31.12.2018 reaching 301.33 from 288.33 (Base 2001- 100) and thereby resulting in an increase of 13 points for Industrial workers and direct that this order shall come into force w.e.f. 01.04.2019.
[post_ads]
RATES OF V.D.A.FOR EMPLOYEES EMPLOYED IN "STONE MINES" shall be as under:-

Item of work Rates of Variable Dearness Allowance as on 01-04.2019
1. Excavation & removal of over burden with 50 meters lead/ 1.5 meters lift.
(i) Soft Soil
Rs. 42
(ii) Soft Soil with rock
Rs. 61
(iii) Rock
Rs.81
2. Removal and stacking of rejected stones with 50 metres lead/ 1.5 Metres lift. *
Rs.33
3. Stone breaking or Stone Crushing for the Stone size of:-
1.0 inch to 1.5 inches
Rs. 246
Above 1.5 inches to 3.0 inches
Rs. 210
Above 3.0 inches to 5.0 inches
Rs. 125
Above 5.0 inches
Rs. 102

Therefore, the minimum piece rate wages showing the basic and Variable Dearness Allowance payable w.e.f. 01.04.2019 to the employees employed in Stone Mines shall be as under:-

Category Basic Wages VDA Total
1. Excavation & removal of over burden with 50 meters Lead/ 1.5 Meters lift. *
(i) Soft Soil Rs.351 + Rs.42 = Rs. 393
(ii) Soft Soil with rock Rs.531 + Rs.61 = Rs.592
(iii) Rock Rs.703 + Rs.81 = Rs.784
2. Removal and stacking of rejected stones with 50 meters lead/ 1.5 meters lift * Rs. 283 + Rs.33 = Rs.316
3. Stone Breaking or Stone Crushing for stone size of category ** Basic Wages VDA Total
(i) 1.0 inch to 1.5 inches Rs.2171 + Rs. 246 = 2417
(ii) Above 1.5 inches to 3.0 inches Rs.1857 + Rs. 210 = 2067
(iii) Above 3.0 inches to 5.0 inches Rs.1088 + Rs.125 = 1213
(iv) Above 5.0 inches Rs.893 + Rs.102 = 995



The workers employed on minimum guaranteed time rate of wages per day shall be entitled to time rate of minimum wages plus special allowance, if any, for unskilled category of above ground workers revised from time to time by the Central Government in respect of scheduled employment in stone mines.

* Per 2.831 cube meters (100 cubic feet)
** Per truck load of 5.662 cubic meters (200 cubic feet)

sd/-
(RAJAN VERM A)
CHIEF LABOUR
COMMISSIONER (C)
VDA-wage-for-stone-mines-employee-page-01

VDA-wage-for-stone-mines-employee-page-02


VDA & Minimum Wage w.e.f. 1.4.2019 for employees working in Agriculture (Click to view)
VDA & Minimum Wage w.e.f. 1.4.2019 for Mines employees (Click to view)
VDA & Minimum Wage w.e.f. 1.4.2019 Construction, Maintenance of Roads or Railway or Building Operations Employees (Click to view)
VDA & Minimum Wage w.e.f. 1.4.2019 Sweeping and Cleaning employees (Click to view)
VDA & Minimum Wage w.e.f. 1.4.2019 Watch and Ward (without arms) employees (Click to view)
VDA & Minimum Wage w.e.f. 1.4.2019 Loading and Unloading Employees (Click to view)
Next Post
Previous Post

0 Comments: